The project


• Construction of sewage pipelines.
• Construction of transpiration bed and lining it with HDPE geomebrane liner.
• Construction of potable water storage tank on a 9m steel stand.

Our Latest projects

HEAD OFFICE

Plot 68289, Morula Industrial Park, Phakalane, Gaborone
+267 318 0422
tkm@tkm.co.bw
Copyright © All rights reserved | Inspired by Colorlib & Design By zwinolo