• Construction of two workshops with an office block of 300m2. • Supply material, fabrication, sand blasting, painting, delivering to site and erection of 37 ton steel structure. • Refurbishment and erection of 134 ton of pre used steel structure. • Installation of 2500 m2 of 0.8mm Chromadeck IBR Roof and cladding sheets • Supply office furniture • Supplying, Installation, connecting to the existing sewer line and commissioning Gorman Rupp T3A3S Bare Shaft Pump • Construction of water and sewer reticulation. • Casting 200 m3 of reinforced concrete. • Paving 1200 m2 with heavy duty interlocking bricks • Painting of floors with epoxy flooring paint. • Installation of plumbing, electrical and mechanical works