The project


• Construction of two workshops with an office block of 300m2.
• Supply material, fabrication, sand blasting, painting, delivering to site and erection of 37 ton steel structure.
• Refurbishment and erection of 134 ton of pre used steel structure.
• Installation of 2500 m2 of 0.8mm Chromadeck IBR Roof and cladding sheets
• Supply office furniture
• Supplying, Installation, connecting to the existing sewer line and commissioning Gorman Rupp T3A3S Bare Shaft Pump
• Construction of water and sewer reticulation.
• Casting 200 m3 of reinforced concrete.
• Paving 1200 m2 with heavy duty interlocking bricks
• Painting of floors with epoxy flooring paint.
• Installation of plumbing, electrical and mechanical works